The project includes laying a 110 mm diameter plastic pipe at the length of 14,000 m in the 9 villages fed by the Bshmmana Water Project in Nineveh Governorate. The work stages included the preparation of the plastic pipe which is ISO-certified, piping and covering it with soft sand, in addition to carrying out drilling and preparing the mechanisms and materials needed to carry out burial work along the pipeline.