Construction of The 8.2 Km Hurriyat Road in Essaouira District
Scope of Work :
The scope of work encompasses several key tasks. This includes the preparation of materials and procurement of equipment required for conducting the necessary surveys and designs for the road. Subsequently, the road will be elevated by layering it with high-quality, clean soil, with each layer having a thickness of 25 cm, adhering to the provided designs. This process will result in the creation of a road box measuring 5.5 m in width and 30 cm in height. Following this, gravel material, 30 cm thick, will be spread and compacted in two layers. The paving process will commence with the application of a base layer spanning 5 m in width. Additionally, sub-base work will be conducted to construct the road's shoulders, which will have a width of 1.5 m. Concrete tubes and box culverts of various diameters and sizes will also be fabricated, in accordance with the general specifications outlined for roads and bridges.
Project Location : Wasit Governorate
Client : Wasit Governorate
Contract Value ( US$ ) : 817,302.00
Contract Duration : 210 Days
Contract Start Date : 01 / Feb / 2021
Contract Completion : 29 / Aug / 2021