Implementing Heavy Sewerage and Rainwater Networks With Sewage Stations in Al-falahiya Area / Neighborhoods (Imam Al-rida (Peace Be Upon Him), Al-sisiyyat, Al-jamiāah) in Al-kut District
Scope of Work :
This project holds immense significance for the local infrastructure, standing as a vital endeavor for areas in Kut with similar requirements. It encompasses the entire process, from design to equipping, erection, installation, and extension of conveyor lines. The project involves the construction of a heavy lifting station, rainwater stations, and the installation of comprehensive network systems. Additionally, it includes the extension of multiple conveyor line pipes.
Project Location :
Wasit Governorate / Kut District
Client :
Wasit Governorate Office
Contract Value ( US$ ) :
17,927,234.00
Contract Duration :
900 Days
Contract Start Date :
08 / Jul / 2021
Contract Completion :
Completion rate %80