Supply, Install, and Operate the Desalination Plant in Al-Seneaa City at Saladin Governorate
Scope of Work :
This project includes preparing a drinking water desalination plant with a power of (3,500) per hour. The plant have been installed on Tigris River in the district of Baiji north of Tikrit, to serve the residents of Al-Seneaa city. The Plant lies fifteen kilometers far from the river, and it flows through a ductile pipe along with all its forks inside the city.
Project Location :
Saladin Governorate
Client :
Saladin Water Directorate
Contract Value ( US$ ) :
1.875.000.000
Contract Duration :
12 Months
Contract Start Date :
5/6/2011
Contract Completion :
29/5/2012